Skip to content

Test Flight Checklist

  • Appoint a designated checklist enforcer:

Itemized Summary

Devices

  • Router (1)
  • NUC (1)
  • Blue RFD (1)
  • Ubiquiti Nanostation (1)
  • Ubiquiti Rocket AC (1)

Power

  • Voltage Regulator (2) or Wall Outlet Adapters (2)
  • Batteries (5)
  • PoE Injectors (2)

Cables

  • God Cable (1)
  • Ethernet Cables (6)
  • Turquoise Ethernet Cable for Camera (1)
  • Black Power Cable for Camera (1)
  • Barrel Connector to JST Cable for Jetson power (1)
  • iPhone cable for Wi-Fi hotspot (1)
  • USB-A to USB-C hub dongle (1)

Setup

Ground

Router

  • Router
  • Voltage Regulator #1 (set to 12V) with Battery #1 or Wall Outlet Adapter

NUC (broach)

  • NUC
  • Voltage Regulator #2 (set to 19V) with Battery #2 or Wall Outlet Adapter
  • Blue RFD to NUC USB port
  • Ethernet cable #3 from NUC to router "LAN" port

Nanostation

  • Ubiquiti Nanostation
  • PoE injector #1
  • Ethernet cable #1 from Nanostation to PoE Injector "PoE" port
  • Ethernet cable #2 from PoE injector #1 "LAN" port to Router "LAN" port
  • Battery #3 connected to XT60 on PoE injector #1

Antenna Tracker

  • Ethernet cable #4 from Arduino to router "LAN" port
  • Battery #4

Plane

Jetson

  • Jetson Orin Nano
  • God cable (labeled "god")
  • Barrel connector to JST cable
  • barrel end goes in Jetson
  • JST end goes in god cable
  • Battery #5 to white end of god cable
  • Turquoise Ethernet Cable from Jetson to Camera

RocketAC

  • Rocket AC
  • Ethernet cable #5 to Poe port on Poe injector #2
  • Ethernet cable #6 from Poe injector #2 lan port to USB-Ethernet on Jetson

Camera

  • Camera
  • Black power cable from Camera to TX60 (yellow) connector on God cable

Pre-Flight

  • Test image before mounting camera
  • GCS connection up
  • Router page open
  • Test image after mounting camera (remove lens cap!)
  • Designate backup human antenna tracker:
  • Designate human to disarm plane on landing:
  • Designate flight scribe: